Prepare for the NABCEP PVIP exam questions with our authentic preparation materials, including free PVIP practice exam questions and answers. TheExamsLab provides all the support you need to succeed in the PV Installation Professional (PVIP) Board Certification PVIP exam. This dedication to student success is why we have the most satisfied PVIP certification exam candidates worldwide.
A residential PV system uses two 120.240Vac utility-interactive inverters with a sealed lead-acid battery
energy backup for protected loads. The MOST important protected load consideration when operating in the
backup mode is that:
A project is using a PV module with a 25-38dc maximum power voltage range and a single input inverter with
an operating windows of 250vdc-450dc. The dwelling the system is to be installed on has a 5:12 roof with a
southeastem face that can accommodate 14 modules and southwestern face that can accommodate 10 modules.
What is the MAXIMUM number of modules that can be installed for proper inverter maximum power point
tracking?
Which of the following is an NEC requirement regarding access for large-scale PV electric power production
facilities?
The following dc portion of a PV schematic (functionally grounded conductor not shown) is submitted to the building official for permit approval. The building official, who also is he AHJ, allow the system to be installed by requiring what NEC-required MINIMUM size equipment grounding conductor at Location A?
Which of the following is an NEC requirement regarding access for large-scale PV electric power production
facilities?
© Copyrights TheExamsLab 2024. All Rights Reserved
We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the TheExamsLab.