When calculating the power demand of a UPS (Uninterruptible Power Supply) system, only the backend capacity needs to be considered, and redundancy for the load does not need to be accounted for, while the capacity of the battery can be ignored.
In a data center where precision cooling units are supplied by single-phase power, using dual power supplies and ATS for switching can meet Tier III requirements if both units share a single ATS.
What are the primary components of a data center's typical energy consumption?
When calculating the power demand of a UPS (Uninterruptible Power Supply) system, only the backend capacity needs to be considered, and redundancy for the load does not need to be accounted for, while the capacity of the battery can be ignored.
Adjusting the high air temperature at the end of the cooling system can effectively reduce the energy consumption of the cooling system and lower the PUE (Power Usage Effectiveness) value.