Free ATM Exam Questions - Easiest Way for Success

Prepare for the ISTQB ATM exam questions with our authentic preparation materials, including free ATM practice exam questions and answers. TheExamsLab provides all the support you need to succeed in the Advanced Test Manager ATM exam. This dedication to student success is why we have the most satisfied ATM certification exam candidates worldwide.

Page:    1 / 13      
Total 65 Questions | Updated On: Sep 14, 2024
Add To Cart
Question 1

In the next two months some new features will be constantly added to new releases of a project you are
working on as Test Manager.
You have identified as one of the main project risks, that the requirements specification will still be
incomplete when your team starts the test design and implementation phase.
Some requirements will most likely be completed too late to allow a proper test preparation.
You and your test team have already worked on several similar past projects in the same organization.
Which one of the following options would you expect to be the most effective at mitigating this risk?


Answer: B
Question 2

Assume you are working on a CAS (Conditional Access System) for Pay-TV that allows the access,
selection and transfer of services and media to authorized users. Authorized users can choose their
services through different channels: Web Customer Portal, IVR (Interactive Voice Response), Call Centre
and SMS. The system uses a Smart Card to receive and decrypt the broadcasted encrypted control words
which allow decrypting pay-per-view TV. Every authorized user must have a Smart Card and a Set-Top Box
to view the contents.
The following is an excerpt from the product risk analysis document:
Both likelihood and impact have been rated on the following scale: (1 – Very low, 2 – Low, 3 – Medium, 4 –
High, 5 – Very High).
The required test environment and code have been delivered. All test cases for each identified product risk
item have been written and are ready to be executed. The Database used to contain the Smart Cards is
empty and so only new Smart Cards can be used during test execution.
A Smart Card can only be activated if it has been previously pre-activated. This means the post-conditions
for the execution of the test cases to test the pre-activation of the Smart Card are the pre-conditions for
activation of the Smart Card.
Which of the following statements represents the most effective contribution of the stakeholders to the
completion of the failure mode analysis table?

1


Answer: B
Question 3

Which of the following information would you expect to be the most useful to perform a defect clustering analysis?


Answer: B
Question 4

Which of the following statements describing the consequences of specifying test conditions at a detailed level is NOT true? 


Answer: A
Question 5

Assume you have some data related to confirmation testing during system testing of a past project.
In that project 240 bug reports have been opened once, 80 were opened twice, 10 were opened three times
and no bug reports have been opened more than three times.
You estimate that a bug report, which has failed its confirmation test, costs, on average, 3 person-hours.
Which of the following statements correctly describe the value of these confirmatory testing activities based
on cost of quality?


Answer: A
Page:    1 / 13      
Total 65 Questions | Updated On: Sep 14, 2024
Add To Cart

© Copyrights TheExamsLab 2024. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the TheExamsLab.