Special Offer! Sale of the Month | Extra 20% OFF - Ends In Coupon code: TEL20
Stay ahead with 100% Free Implementing and Operating Cisco Service Provider Network Core Technologies 350-501 Dumps Practice Questions
A company is expanding its existing office space to a new floor of the building, and the networking team is installing a new set of switches. The new switches are running IGMPv2, and the engineers configured them for VLAN10 only. The rest of the existing network includes numerous Layer 2 switches in multiple other VLANs, all running IGMPv3. Which additional task must the team perform when deploying the new switches so that traffic is switched correctly through the entire network?
Refer to the exhibit. Router R1 is configured with class map CE with match Ip precedence critical to align
with customer contract SLAs. The customer is sending all traffic from CE1 toward the FTP server with IP
precedence 5 A network engineer must allow 10% of interface capacity on router R3 Which two actions must
the engineer take to accomplish the task? (Choose two )
Refer to the exhibit. Router R1 is configured with class map CE with match Ip precedence critical to align
with customer contract SLAs. The customer is sending all traffic from CE1 toward the FTP server with IP
precedence 5 A network engineer must allow 10% of interface capacity on router R3 Which two actions must
the engineer take to accomplish the task? (Choose two )
Refer to the exhibit.
© Copyrights TheExamsLab 2025. All Rights Reserved
We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the TheExamsLab.