300-620 exam questions are expertly crafted practice tests designed to simulate the real Cisco certification exam environment and help you assess your knowledge and figure out where you are lacking. From our free Implementing Cisco Application Centric Infrastructure 300-620 practice exam, you will feel secure in passing any question type or time limit. TheExamsLab offers the 300-620 exam questions 2024. Don’t settle or do it half-heartedly get the best and invest in the best what you want is what you get.

Page:    1 / 59      
Total 294 Questions | Updated On: Nov 21, 2024
Add To Cart
Question 1

An engineer configures port-12 on Leaf-101 and Leaf-102 to connect to a new server called SVR-12. This server will belong to a new EPG-12 and needs to use Encapsulation VLAN-12. An already existing server, which is named SVR-10, is also connected to the same leaf switches. SVR-10 belongs to EPG-10 and also uses Encapsulation VLAN-12. Which step must the engineer take to configure connectivity for SVR-12 and EPG-12?


Answer: B
Question 2

27

Refer to the exhibit. An engineer wants to initiate an ICMP ping from Server1 to Server2. The requirement is for the BD1 to enforce ICMP replies that follow the expected path. The packets must be prevented from taking the direct path from Leaf1 to Server1. Which action must be taken on BD1 to meet these requirements?


Answer: C
Question 3

An engineer must connect a new host to port 1/1 on Leaf 101. A Cisco ACI fabric has an MCP policy configured but experiences excessive Layer 2 loops. The engineer wants the Cisco ACI fabric to detect and prevent Layer 2 loops in the fabric. Which set of actions accomplishes these goals?


Answer: D
Question 4

A Cisco ACI is integrated with a VMware vSphere environment. The port groups must be created automatically in vSphere and propagated to hypervisors when created in the ACI environment. Which action accomplishes this goal?


Answer: D
Question 5

43

Refer to the exhibit. An engineer configures an L3Out but receives the error presented. Which action clears the fault?


Answer: A
Page:    1 / 59      
Total 294 Questions | Updated On: Nov 21, 2024
Add To Cart

© Copyrights TheExamsLab 2024. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the TheExamsLab.